Studio
Twelve people in a converted sail loft on Wharf Street. Founded in 2012 by Ingrid Norra.
How we think
Good buildings are mostly decisions about what to leave out.
Site first
We spend time on the land in different weather before we draw.
Few materials
A short palette, used honestly, ages better than a long one.
Built, not rendered
We stay through construction. The drawing isn't the work; the building is.
People
Ingrid Norra
Founding partner, architect
Peter Halloran
Partner, technical lead
Mei Lin Ashby
Associate, interiors
Tomás Reyes
Architect, model shop
From brief to building
- Stage 1
Site & brief
Site visits, survey review, and a written brief we agree together.
2–4 weeks - Stage 2
Concept
Massing models, plans and a first cost check with a builder.
6–8 weeks - Stage 3
Design development
Materials, structure, interiors and consultant coordination.
8–12 weeks - Stage 4
Permits & tender
Permit drawings, specifications and contractor pricing.
6–10 weeks - Stage 5
Construction
Weekly site visits, detail drawings and handover.
12–18 months